Project: Expressway R2 Kriváň – Mýtna, DC02 Bridge – assessment of construction stages changes
Client: Stráský, Hustý a partneři s.r.o.
Date of start: 20 June 2024
Deadline: 4 July 2024
Responsible person: Miloš Zich, Ph.D.
Description of the action. The action is a follow-up to the control calculation of the load-bearing structure of the DC2, DC3 and DC4 expansion units of the R2 Kriváň – Mýtna expressway in Slovakia carried out in the years 2021-2022 at UBZK FAST BUT. The calculation is aimed at verifying the principle of change of construction stages, i.e. the impact on all assembly conditions, the stability of the erected cantiliver, and the assessment of the details of the ballast placement on the bridgedeck. All assessments and results will be presented in the final report.