Project: Footbridge over the Dyje River in Breclav near the Slovácký rowing club
Client: HURYTA s.r.o.
Date of start: 12 May 2025
Deadline: 12 September 2025
Responsible person: Jan Koláček, Ph.D.
Description of the action. The footbridge will connect the Antonín Dvořák embankment street on the left bank with the area of the Břeclav club on the right bank of the river Dyje in Břeclav. The static calculation will be performed in the ANSYS software as a geometrically non-linear calculation with the influence of large deformations.
The caculation model will consist of bar elements and plate elements. The model will represent the actual deep foundation. Important part of project includes finding the initial state of the structure, and a static analysis will be carried out with respect to the stresses on the suspension cables and stayes for critical combinations of permanent and variable loads. The dynamic analysis on the above calculation model will be composed of modal (calculation of eigenmodes and frequencies) and harmonic analysis (determination of horizontal and vertical accelerations) and complemented by assessment according to the applicable EC2 codes. All results will be presented in the final report.